Dosage engineering

Cement Grinding Aid Dosage Guide

Dosage is a product- and cement-specific trial variable. This guide explains units, consumption and control boundaries.

Published by CementGrindingAid.com · Last reviewed 10 October 2026 · How this content is produced

Three equivalent dosage units

UnitConversionExample
g/tgrams of product per tonne of treated material300 g/t
kg/tg/t ÷ 1,0000.300 kg/t
% by massg/t ÷ 10,0000.0300%

Consumption formula

Product kg/h = cement output t/h × dosage g/t ÷ 1,000. For a liquid volumetric pump setting, divide kg/h by the current product density in kg/L. Density must come from the selected grade’s current specification.

Use the dosage calculator →

Why a generic range is not a prescription

Public industry information often discusses low hundreds of grams per tonne, but the optimum for a particular commercial product must come from its current guidance and controlled trials. Product concentration, cement composition, mill system and objective can all change the working point.

Trial controls

  • Calibrate the pump or feeder before collecting results.
  • Confirm whether dosage is based on total cement, clinker plus additions or another material stream.
  • Maintain equivalent cement quality when comparing throughput.
  • Evaluate several documented dosage steps rather than jumping to a claimed optimum.
  • Watch for setting, strength, flow or process changes that may indicate an unsuitable dose.

Standards & method references

The applicable standard, edition and local regulatory requirement must be confirmed for each project. A reference does not claim product compliance.

Worked example: mass, volume and stock

Illustrative inputs only: 100 t/h of cement, a user-selected 300 g/t dose, 20 h/day and 25 days/month. These are not recommended operating values or a product specification.

Consumption arithmetic with explicit units
QuantityCalculationResult
Product mass per hour100 × 300 ÷ 1,00030 kg/h
Daily consumption30 × 20600 kg/day
Monthly consumption600 × 2515,000 kg/month
Volume with an assumed density of 1.20 kg/L30 ÷ 1.2025 L/h

The density is invented for this example, not an IN-5 value. Replace it with the current grade-specific value at the relevant conditions. Mass-based consumption alone is not a pump calibration or evidence of effective performance.

Common basis mistakes to resolve before comparing quotes

  • Product mass versus active-solids mass: name the basis and the current solids fraction; do not substitute one for the other.
  • Cement output versus clinker feed: use the material basis specified for the selected grade.
  • kg/h versus L/h: volumetric conversion needs density; grams per tonne is not grams per hour.
  • Planned capacity versus observed throughput: label estimates and actual records separately.

Use the mass-consumption calculator, then retain the assumptions in the trial review record. For a named-grade discussion, use IN-5 consumption planning.

Review your cement and mill baseline

Send cement type, mill system, output, kWh/t, fineness, strength and target.

Contact Tony